New compressor in record time: 132 kW system installed in 4 weeks
In the metalworking industry, compressed air is as essential as electricity. When a main compressor fails unexpectedly and production comes to a standstill, every hour counts. In a market situation in which delivery times of 12 to 14 weeks are not uncommon for large industrial systems, such a failure quickly becomes a risk that threatens the company’s existence.
Together with its premium partner Kronwald Druckluft- und Kompressorentechnik GmbH, SCC air compressors proves that there is another way. Kronwald Druckluft has already proven in past projects, such as the emergency supply of a large steelworks, that technical expertise and speed of response go hand in hand. This recent case in Lower Saxony once again showed how the well-coordinated team of manufacturer and specialist partner was able to realize a seemingly impossible schedule.
Problem – Why a new compressor was urgently needed
November began with bad news for a leading metalworking company in Lower Saxony. The central, speed-controlled compressor from another manufacturer reported a fatal fault. The diagnosis from maintenance was clear: stage damage, a total economic loss.
The system supplied large parts of production with process air. Without this main supplier, several production lines were at risk of coming to a complete standstill. The challenge was massive:
- Critical dependency: The existing redundancies were not sufficient for full-load operation.
- Specific requirements: A powerful 132 kW machine with variable speed control was required to efficiently absorb the fluctuating loads.
- Extreme time pressure: a standard delivery process of three months was unacceptable. A new compressor had to be delivered immediately.
Solution – Install STRONG 132 speed-controlled screw compressor quickly
After the customer made initial contact, the Kronwald Druckluft team responded immediately. In direct coordination with SCC air compressors, they checked which machine was immediately available from a technical and logistical point of view. The choice fell on the STRONG 132a highly efficient, speed-controlled screw compressor.
The key technical data of the STRONG 132 impressed the customer’s engineers straight away:
- Motor power: 132 kW for demanding industrial processes.
- Drive: Loss-free direct drive with permanent magnet motor (efficiency class IE4).
- Technology: Frequency-controlled operation (VSD) for precise adjustment to the compressed air requirement and stable operating pressure (designed for 7-10 bar).
But the availability of the machine was only the first step. In order to integrate the system perfectly into the customer’s existing energy concept, a heat recovery system was retrofitted in no time at all. In addition, the control system was configured so that it communicates seamlessly with the plant’s higher-level control technology.
The project schedule: From inquiry to compressed air in 26 days
What normally takes months was realized here in less than four weeks. The following timeline illustrates the enormous speed with which SCC air compressors and Kronwald Druckluft acted:
| Date | Milestone |
| 06.11.25 | Inquiry & diagnosis: Notification of the stage damage to the customer. Start of emergency planning. |
| 07.11.25 | Technical coordination: Kronwald Druckluft and SCC air compressors define the optimum replacement solution. |
| 13.11.25 | Order: Official commissioning by the customer after clarification of all technical details. |
| 17.11.25 | Individualization: Start of retrofitting (heat recovery & control) at the factory. |
| 28.11.25 | Shipping: The tested compressor leaves the warehouse by express transportation. |
| 01.12.25 | Arrival: Delivery to the customer in Lower Saxony. |
| 02.12.25 | Commissioning: Installation, connection and start of production by Kronwald compressed air technicians. |
Advantages – What makes the quick installation of a new compressor possible
The decision to have a STRONG 132 installed by SCC air compressors brought the company far more than just a return to the status quo.
- Immediate production reliability: The extremely short response time of less than four weeks minimized costly production downtimes.
- Maximum energy efficiency: Thanks to the IE4 permanent magnet motor and direct drive, the new compressor works much more efficiently than the old unit. This noticeably reduces running electricity costs.
- Future-proof technology: the integrated heat recovery system uses the waste heat from the compressor for heating purposes or process heat, which improves the plant’s carbon footprint.
- Robustness for industry: The STRONG series is specially designed for the tough operating conditions that are typical in the metalworking industry.
FAQ – Installing a new compressor quickly
How can a new compressor be installed in record time?
The key lies in stock availability and short decision-making paths. SCC air compressors keeps strategically important machine models in stock. In combination with flexible premium partners such as Kronwald Druckluft, adjustments (e.g. heat recovery) can be made in parallel with logistics planning, which drastically shortens lead times.
Why are 132 kW screw compressors suitable for metalworking companies?
In metal processing, compressed air requirements often fluctuate greatly depending on how many CNC machines or sandblasting systems are active. 132 kW screw compressors with speed control offer sufficient peak load reserves, but regulate down efficiently in partial load operation to avoid wasting energy.
What advantages does a speed-controlled screw compressor offer in the event of faults?
If a fixed system fails, there is often a lack of flexibility in the network. A speed-controlled screw compressor can act as a flexible “fire department” in the compressed air network. It precisely stabilizes the pressure band and prevents other compressors from falling into inefficient load-idle cycles.
How does the cooperation between SCC air compressors and premium partners support fast-track projects?
SCC air compressors supplies the technology and hardware availability, while premium partners such as Kronwald Druckluft provide the local expertise for installation, piping and commissioning. This symbiosis eliminates bureaucratic hurdles and ensures that projects are implemented urgently and professionally.
Conclusion – New compressor as a success factor
This case shows impressively that a total technical failure does not have to lead to disaster. If the manufacturer and service partner cooperate seamlessly, even a complex new compressor in the 100 kW class can be realized within a few weeks.
The customer in Lower Saxony now benefits from a modern, energy-efficient compressed air station that was not only quick to install, but also reduces operating costs in the long term. The combination of the powerful STRONG 132 and the implementation expertise of Kronwald Druckluft was the decisive factor in this success.
Do you urgently need support?
Don’t let production come to a standstill. If you need a fast, technically sound solution for your compressed air supply, we can support you with our expertise, high availability and strong partners.
Contact SCC air compressors today for a no-obligation consultation.
Contact form / international
Please do not hesitate to send us your enquiry using our contact form. We look forward to helping you.